The Federal Government has approved two major energy projects in Oyo State aimed at fortifying the national grid and addressing persistent power challenges.
The decisions, ratified during Monday’s Federal Executive Council (FEC) meeting, include reviving and concessioning the decades-old Ikere Gorge Hydropower Plant and constructing a high-capacity new substation in Ibadan, signaling a push to modernize infrastructure and boost electricity access.
The new substation to be located in Lalupon/Ejioku axis of Lagelu local government area will boost power supply to Iwo road, Monatan, Olodo and the adjoining areas in Ibadan.
Originally launched in 1979 under the military regime of former President Olusegun Obasanjo and operationalized in 1980 during President Shehu Shagari’s tenure, the Ikere Gorge Hydropower Plant will now undergo a significant upgrade. Power Minister Adebayo Adelabu revealed that the facility’s capacity will expand from 6MW to 20MW under a 30-year public-private partnership (PPP) concession.
According to a statement from the Special Adviser, Strategic Communications and Media Relations to the Minister of Power, Bolaji Tunji, the project, initially stalled due to a preferred bidder’s failure to finalize terms, was re-concessioned to a reserve contractor, Messrs Quaint Power and Infrastructure Nigeria limited, after the original offer lapsed. Adelabu emphasized that the revitalized plant will prioritize energy access for Oyo’s Oke Ogun communities, with an upwardly revised concession fee ensuring long-term viability.
ALSO READ
- Lenders Push Back as Failed Pipeline Sale Is Quietly Revived
- ENERGY TIMES Award Holds Today in Lagos
- Energia Appoints Oladimeji Bashorun as CEO
- ENERGY TIMES to honour Adelabu, Yahaya, Attah, Others April 17
- Artemis II Crew Splashes Down from Moon into Pacific Ocean at 1:08 a.m. Nigerian Time
Meanwhile, the government also approved the construction of a 2 x 60MVA, 132/33KV substation in Lalupon/Ejioku in Lagelu local government area of the State, to alleviate pressure on the grid and improve energy supply. The substation, part of the Siemens-backed Presidential Power Initiative (PPI), is to be funded directly by the Federal Ministry of Power and aims to resolve frequent outages and grid instability plaguing the state capital.


